Application Migration / Modernization
Moving production workloads to the cloud with near-zero downtime and modernizing them so they earn their keep.
Migration without modernization is moving rent. Modernization without migration is engineering for engineering's sake. We do both, in the right sequence, for the right reasons.
Some workloads move first. Some refactor first. Some should not move at all.
Move first, modernize later
When the data center exit date is real and the business cannot wait. Stable cutover. Documented dependencies. Modernization waves planned after the move.
Refactor before you move When lifting as-is would lock in years of technical debt. Re-architect the workload so it benefits from cloud the moment it arrives.
Do not move at all
Some workloads should not move. We tell you which, and why, before a single migration wave begins.
Three disciplines, one delivery model.
Migration
Discovery and dependency mapping, lift-and-shift, replatform, refactor, rebuild, near-zero downtime cutovers, database migration, parallel-run validation, rollback runbooks.
Modernization
Containerization (AKS, ACA, ECS), serverless (Functions, Logic Apps, Lambda), microservices decomposition, API-first re-architecture, event-driven patterns, legacy decommissioning.
Delivery Discipline
CI/CD, DevSecOps, blue/green and canary release, performance engineering, observability from commit, post-cutover hypercare.
Outcome
Production workloads relocated and modernized with near-zero downtime, reduced run cost, and a clear decommissioning path.